Approved Subfloors for Konecto Vinyl Flooring


***ALL SUBFLOORS MUST BE SOUND, SOLID AND HAVE LITTLE FLEXIBILITY***

Approved Subfloors for Konecto Vinyl Flooring:

- Concrete:
Any large cracks or voids must be filled with a cementitious patching compound.

- Lightweight Concretes: Are approved.

- Wood Subfloors:
Must be sturdy, flat and have little flexibility.

- OSB:
Is approved, but must be sturdy, flat, and have little flexibility.

- All Other Subfloors:
i.e. - particleboard, chipboard, wafer board, etc. must be sturdy, flat, and have little flexibility.

- Quarry Tile, Terrazzo, and Ceramic Tile:
use caution with highly embossed tile. This type of tile plus grout joints wider than 1/8 inch should be filled with a high quality cementitious patching product.

- Radiant Heat:
Subfloors should have operated for at least 3 weeks prior to installation to drive out moisture and calibrate temperature settings. All radiant heat floors should be turned off 3 days prior to installation and remain off for at least 6 days after installation to allow the adhesive to fully cure. Maximum operating temperature should never exceed 85ºF. Radiant heat components must be a minimum of 1/2" inch separated from Konecto™. This is the only type of radiant heat that is approved.


Questions or want to place an order please call1-877-357-9663 or visit www.flooringmarket.com.

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.